We Are Hiring!
| Design_ Calculation | |
| Load demand calculation with load factor & diversity factor | |
| Voltage drop calculation | |
| System harmonics calculation | |
| Transformer & DG sizing for substation | |
| Power factor calculation & correction | |
| Bus Bar sizing | |
| IP rating | |
| Panel heat load calculation | |
| Arc flash calculation | |
| Earthing System calculation & design (Earth Pits, Earth Grids etc. ) | |
| Cable tray & conduit sizing | |
| Design & Selection | Power/control cabinets & Busbar system design |
| Instrumentation:CT,PT,ameter,voltmeter,MFM etc. | |
| Switch Gear selection-(Protection: Fault current,overload,earth leakage) | |
| Starter selection- DOL/Star-delta/VFD etc. | |
| Selection of PLC (Siemens ) | |
| Selection of panel cooling system | |
| Cable connection & distribution | |
| Cable specification selection (Types of cable) | |
| Sub-station design | |
| Transformer & DG selection | |
| APFC cabinets design | |
| Cable trays & conducting with support system | |
| SCADA integration | |
| BOQ, BOM | |
| Design Basis / brief report | |
| Equipment specification - PCC, MCC, HV Board, APFC, Motor, Genset, Transformer, Earthing, Lightning protection, Lighting fixtures, DB, Junction Box, Cable tray and Conduits, Cables | |
| Engineering information (Site execution) manual | |
| Design Drawings | Single Line Diagram(SLD) preparation of complete power distribution network. |
| Protection, Control and interlock diagrams. | |
| Schematic in E-Plan (PLC control & MCC cabinets) | |
| Cabinet detailed GA (PLC control & MCC cabinets) | |
| Layouts preparation (Panel, Substation, Cable tray,Lighting,earthing) | |
| Instrumentation and SCADA schematics | |
| Schematics - DG synchronisation, Load sharing and load shedding. | |
| Onsite Support | Fault find-oveload,short circuit, earth leakage, tripping |
| Onsite power analysis | |
| Installation support | |
| Help in electrical system commissioing onsite | |
| System study and improvements | |
| Additional knowledge | |
| Internal arc testing | |
| Electrical equipment selection for hazardous area | |
| High efficiencies equipment like IE3 | |
| Power analyzer | |
| Protection relay & their setting (Power system) | |
| Synchronization of DG | |
| Regenerative dyno of Dynamometers | |
| Electrical installation guide line based on standards IS/NFPA/ | |
| Type of co-ordination | |
| Software | Excel & word |
| Thermal Cabinet Calculation | |
| ETAP -Optional | |
| TIA Portal - HW Configuration (Siemens) | |
| E-PLAN- Must ( Min.3 Years hands on experience) | |
| Standards | HAC- IS 5572 : 2009,NFPA 497:2012,NFPA 30 : 2015, |
| NBC-2005,IS 3034 :1993 | |
| IS, IEC and NEC | |
| 2004-108 EC EMC Directive | |
| EN 61439 Low Voltage Switchgear Assembly | |
| EN 62061 Functional Safety | |
| EN 60204 Safety of Machinery | |
| High Voltage Directives | |
| Communication Skills - | Excellent |
| BOM Preperation | Detail BOM of Control,PCC,MCC cabinets |
| Detail BOM Cables with gland, conduit & coupler | |
| Detail BOM of lights & sockets | |
| Detail BOM of earthing system | |
| QAP preperation |
Interested?
If so, please use our online application tool to send your application to AVL!
Gurugram, IN
Job Segment:
Thermal Engineering, Electrical Engineering, Electrical, Instrumentation, Testing, Engineering, Technology